In short: La Costa Circle was supposed to continue as a regular street into Stonehaven. Ron's account is that Lakemont did not want the connection, so it gave Stonehaven Court a new entrance off St. Andrews, dropped a few house lots, and laid a short asphalt strip between the two streets instead. That strip, the "fire road," is 20 feet wide where the La Costa plans call for a 30-foot road with curbs and gutters, and it has gates at both ends. For the homes off La Costa it is the only second way out in a fire. In 2018 the fire department's key would not open it during a house fire.
Start here: COC Public Summary: "The roads" · Board minutes, June 2018: the house fire · Blog: "Emergency exits: one bridge, a 20-foot fire road and a dead-end street"
What the records say
- "The La Costa Circle 'fire road' was originally designed as a regular road that was to connect to St Andrews or Stonehaven. There are maps that show that road. The builders were supposed to complete that road, but they did not." COC Activity Review, p. 2
- "The La Costa Circle 'fire road' is actually a non-conforming 20' wide asphalt road. La Costa PUD requirements are for a 30' wide asphalt road with concrete curbs and gutters … At 20' wide only one egress lane can be accommodated." COC Public Summary, p. 2 · presented at the board meeting (about 1:05)
- The 2005 map of Stonehaven Court shows a "temporary turnaround" at its end, not a finished connection. Final map Unit 2H (#350061), 2005, p. 2
- The committee's photo map marks the 30-foot DVCA lot line between La Costa Circle and Stonehaven Court, where the road should be widened. COC gates pictures, p. 7
- The sewer and water mains run under the fire road. COC developers meeting (about 1:27)
Timeline
- 2005: Stonehaven Court is built under the Unit 2H map with a temporary turnaround. Final map Unit 2H
- 2007: owners list "road repairs on La Costa & La Costa Circle" among the developer's unfinished items. Notes of the HOA meeting with Lakemont, p. 15
- June 2018: a town hall on "Roadway Improvements to Connect La Costa Circle to Stonehaven and Remove Temporary Fence." Town hall notice, June 2018
- June 2018: "During the recent house fire, the fire departments key did not work and they had to saw off the post to get through." Owners on the cul-de-sac object to opening the road; the board keeps both emergency gates, "secured by a removeable pin." Board minutes, June 5, 2018, p. 2
- April 2019: the emergency gates are opened as a detour during road work. Newsletter, April 2019
- 2022: a director notes the other emergency gates around DVCA have rusted locks and asks whether anyone has keys. DVCA board meeting (about 0:52)
- January 2024: a bent post on the La Costa–Stonehaven emergency gate is repaired. DVCA board meeting (about 0:48)
- July 2024: the committee prices a new 260-foot, 30-foot-wide road at about $100,000 and proposes rebuilding it "to connect to Stonehaven." Owners on La Costa Circle worry everyone will then drive out their way. COC minutes, July 9, 2024 · COC meeting (about 1:27) · (about 1:34)
- 2024: "Although the issue of continued gating of this road is up for debate, the need to expand the road is not." COC Public Summary
Open questions
- The original La Costa / Stonehaven street layout ("there are maps that show that road"). The 1990s La Costa unit maps and the maps before Unit 2H would show the planned connection and the lots that were dropped.
- Who installed the gates, and when. The committee says the barrier "was installed by a past board member."
Search words: fire road · emergency access · emergency access road · emergency access gate · emergency gates · crash gate · La Costa Circle · La Costa Cir · Stonehaven · Stonehaven Court · Stonehaven Ct · temporary turnaround · temporary fence · second exit · egress · evacuation · removable pin · 20-foot road